Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 视频国产一区 | 免费观看欧美一级毛片 | 成人国产综合 | 97在线精品视频 | 日韩国产片 | 亚洲欧美在线中文字幕不卡 | 国产成人aaa在线视频免费观看 | 香蕉影视在线观看播放 | 可以免费观看的一级毛片 | 亚洲视频你懂的 | 你懂得视频在线观看 | 伊人久久综合影院 | 日本在线不卡免 | 欧美日韩中文字幕在线视频 | 黄色三级三级免费看 | 天天操天天干天天爽 | 国产性较精品视频免费 | 在线观看视频你懂得 | 免费欧洲毛片a级视频 | 四虎网站最新网址 | a级毛片在线看日本 | 2020国产成人精品免费视频 | 精品 日韩 国产 欧美在线观看 | 日韩欧美国产视频 | 国产一级一级一级国产片 | 成年视频国产免费观看 | 国产最新自拍 | 国产a毛片 | 日本视频免费在线观看 | 欧美成人午夜精品一区二区 | 欧美午夜精品久久久久免费视 | 一二三四在线观看高清中文在线观看 | 国产精品亚洲综合一区 | 手机看片国产在线 | 四虎国产成人永久精品免费 | 手机看片国产欧美日韩高清 | 欧美一级日韩 | 在线va视频 | 国产美女高清一级a毛片 | 国产精品视频永久免费播放 | 国产精品你懂得 |